Gallery - 2024 MAISD HVAC Unit Replacement Project. Project began in November, 2024 to replace failed or failing units.
2024 MAISD HVAC Unit Replacement Project. Project began in November, 2024 to replace failed or failing units.
- Click to see a larger version 2024 MAISD HVAC Replacement at HLH On a overcast day, a rooftop heating, ventilation, and air conditioning unit is set into place with a gantry crane atop the MAISD Helen L. Hamler Administration Building on December 10th 2024. Skip to end of gallery Skip to start of gallery
- Click to see a larger version 2024 MAISD HVAC Replacement at Seiter Education Center On an overcast day, a rooftop heating, ventilation, and air conditioning unit is hoisted atop the Seiter Education Center roof with a crane. Skip to end of gallery Skip to start of gallery
- Click to see a larger version 2024 MAISD HVAC Replacement A grey crane lifts a new roof top unit off of a trailer being pulled by a green work truck. The new unit hovers in the air before being hoisted to the roof and set in place. Skip to end of gallery Skip to start of gallery